| No. Ruas | 33.20.111.2 |
| Nama Ruas | Banyumanis - Beteng |
| Panjang (km) | 4.606 |
| Lebar (m) | 4,5 m |
| Status | Jalan Kabupaten |
| Fungsi |
| No | No Jembatan | Nama Jembatan |
|---|---|---|
| 1 | 33.20.111.02.01 | Watugede |
| 2 | 33.20.111.02.02 | Kodono |
| 3 | 33.20.111.02.03 | Bengkok |
| 4 | 33.20.111.02.04 | Plang Gandul |
| Kondisi | 2023 | 2024 |
|---|---|---|
| Baik | 1.75 | 1.46 |
| Sedang | 2.86 | 3.04 |
| Rusak Ringan | 0.00 | 0.10 |
| Rusak Berat | 0.00 | 0.00 |
| STA | 100 | 200 | 300 | 400 | 500 | 600 | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | 1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | 2400 | 2500 | 2600 | 2700 | 2800 | 2900 | 3000 | 3100 | 3200 | 3300 | 3400 | 3500 | 3600 | 3700 | 3800 | 3900 | 4000 | 4100 | 4200 | 4300 | 4400 | 4500 | 4600 | 4606 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 64 | 36 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 6 |
| Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka |
| Tipe Bahu (Kiri) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Beton | Beton | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
| Tipe Bahu (Kanan) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (Kanan) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Kondisi | Sedang | Sedang | Sedang | Baik | Sedang | Sedang | Sedang | Sedang | Baik | Sedang | Baik | Baik | Baik | Baik | Baik | Baik | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Sedang | Baik | Baik | Baik | Baik | Sedang | Sedang | Sedang | Sedang | Sedang | Rusak Ringan | Sedang | Sedang | Baik | Baik | Baik | Sedang | Sedang | Sedang | Sedang |
| Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
| No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
|---|