| No. Ruas | 33.20.80.19 |
| Nama Ruas | Jend. Anton Soejarwo |
| Panjang (km) | 2.175 |
| Lebar (m) | 5 m |
| Status | Jalan Kabupaten |
| Fungsi |
| No | No Jembatan | Nama Jembatan |
|---|---|---|
| 1 | 33.20.080.19.01 | Ds. Bandengan |
| 2 | 33.20.080.19.02 | Sikembu |
| 3 | 33.20.080.19.03 | Mulyoharjo |
| 4 | 33.20.080.19.04 | Ujungbatu |
| Kondisi | 2023 | 2024 |
|---|---|---|
| Baik | 0.50 | 1.91 |
| Sedang | 1.68 | 0.27 |
| Rusak Ringan | 0.00 | 0.00 |
| Rusak Berat | 0.00 | 0.00 |
| STA | 100 | 200 | 300 | 400 | 500 | 600 | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | 1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2175 | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 30 | 40 | 30 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 75 |
| Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Tanah | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Tipe Bahu (Kiri) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Bahu (Kanan) | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (Kanan) | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tanah | Tanah | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Kondisi | Sedang | Sedang | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Sedang | Sedang | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik |
| Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
| No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
|---|